+86 592-5211-388

info@esolarfirst.com

Hot Products

Completion of Solar First Group's First Floating Mounting Project in Indonesia

2022-12-01

Solar First Group's first floating mounting project in Indonesia:  floating mounting government project in Indonesia will be completed in November 2022 (design started on 25th April), which adopts the new SF-TGW03 floating mounting system solution developed and designed by Solar First Group.



The project is located in Brora District (Antala), Central Java Province, Indonesia. It is reported that the area has frequent dry weather all the year round. The local government has invested in the construction of the Randuguting Dam, which is mainly used to irrigate land and provide raw water for local residents in the surrounding arid areas. After the dam is put into use, its wide water area can provide favorable resource conditions for the development of solar green energy.

Solar First Group provides the owner with SF-TGW03 floating mounting solution, which is made of HDPE(high density polyethylene), anodized aluminium alloy AL6005-T5, zinc-aluminum-magnesium coated steel or hot-dip galvanized steel and stainless steel SUS304.



SF-TGW03



This product solution precisely utilizes the water cooling effect to reduce the evaporation of water resources in the dam, and coupled with the all-weather and sufficient sunlight conditions. It can effectively increase the power generation capacity and maximize the ecological and economic benefits upon completion of the project.This is highly appreciated by the owner.

As the world's leading PV mounting solution provider, Solar First Group, with the vision of "New Energy, New World" as its mission, has mastered international advanced technology in the field of solar photovoltaics and always stands at the forefront of innovation and research. and it is committed to promoting the innovative development of the PV industry with high technology and contributing to the sustainable development of new energy in the world.


New energy, new world!


Note: The same series of SF-TGW01 floating PV mounting system from Solar First Group offers a new solution for building PV floating plants with its high energy efficiency, high quality, ease of operation and environmental reliability. The system was first launched in 2020, and in 2021 it passed the rigorous technical tests and was certified by TÜV Rheinland (with whom Solar First Group has cooperated since its establishment in 2011) as being capable of withstanding any complex climatic conditions and having a service life of at least 20 years.


SF-TGW01





 
chat Now Request A Free Quote
If you have any problem when using the website or our products, please write down your comments or suggestions, we will answer your questions as soon as possible!Thank you for your attention!