Project information
Project: Guangxi County Promotion Project Rooftop Power Station
Installation capacity: 300MWp
(household + industrial and commercial + government units)
Product Type: Roof PV Mounts
Construction time: 2021~2022
Project information
Installed capacity: 4.5MWp
Tracking system type: Horizontal Single Axis Tracker
Project Location: Israel
Construction time: July 2025 – March 2026
This project is a typical "photovoltaic + agriculture" flat single-axis tracking application. With a capacity of...
Project information
Project: Malaysia 1MWp Rooftop Power Plant Project
Installation: 1MWp
Product Type: Metal Tile Roof Bracket
Project Location: Malaysia
Construction time: April 2021
Project information
5.19MWp Horizontal Single Axis Tracker Project in Malaysia
Installed capacity: 5.19MWp
Tracking system type: Horizontal Single Axis Tracker
Project Location: Malaysia
Project start time: 2025.1
Project information
Project: Vietnam 15MW Rooftop Power Station
Installed capacity: 15MWp
Product Type: Metal Tile Bracket
Project location: Vietnam
Construction time: 2020
Project information
20MWp Horizontal Single Axis Tracker project in Romania
Installed capacity: 20MWp
Tracking system type: Horizontal Single Axis Tracker
Project Location: Romania
Construction time: 2023
Project information
Project: Vietnam 7.5MWp Rooftop Power Station
Installed capacity: 7.5MWp
Product Type: Metal Tile Bracket
Project location: Vietnam
Construction time: 2020
Project information
20MWp Horizontal Single Axis Tracker project in china
Installation: 20MWp
Tracking system type: Horizontal Single Axis Tracker
Project Location: Shaanxi
Construction time: May 2020
Project information
Project: Malaysia Ground Power Station
Installation: 13MWp
Product Type: Fixed Bracket
Construction time: 2019
Base: PHC spinning pile
The largest spinning pile foundation project in Malaysia
Project information
Project: Vietnam 6MWp Rooftop Power Station
Installed capacity: 6MWp
Product Type: Metal Tile Bracket
Project location: Vietnam
Construction time: 2020
Project information
Yulin 55MWp Horizontal Single Axis Tracker
Installation capacity: 55MWp
Tracking system type: Horizontal Single Axis Tracker
Project Location: Shaanxi, China
Construction time: May 2019