Xiamen Solar First has completed 13MWp Concrete Pile Solar Ground Mounting project in Malaysia in 2019. This system is designed with anodized aluminum alloy structure and HGD pile hoops, applicable to water pools, marshes, wetlands and deep mud areas with 25 years’ life span. 40% of the components and structures are pre-assembled before dispatch, which significantly saves construction time and cost for EPC’s and developers.