+86 592-5211-388

info@esolarfirst.com

Blog

Home /

Blog

/ 38MWp Concrete Pile Solar Ground Mounting Project

38MWp Concrete Pile Solar Ground Mounting Project

2019-05-27

Solar first is one of the global leading manufacturers of solar mounting structure systems to installers, distributors, EPC’s and developers. Up to now, cumulative installations have reached 1.4GW.

Recently, Solar First has completed 38MWp concrete pile solar ground mounting project in Malaysia. This system is designed with full anodized aluminum alloy structure with the only exception for pile hoops(HDG), and applicable to water pools, marshes, wetlands or deep mud areas with 25 years life span. 40% of the components and structures are pre-assembled before EXW, which significantly saves construction time and cost for EPC’s and developers.

solar mounting structure systems

solar mounting structure systems

 
chat Now Request A Free Quote
If you have any problem when using the website or our products, please write down your comments or suggestions, we will answer your questions as soon as possible!Thank you for your attention!