Project Name: Coal Handling and Storage System of Philippine TOLEDO Power Plant
Status:Completed in 2011
Location: Cebu, Philippine
Handling Material:Coal
BW of Conveyor:800mm-1,200mm
Conveying Capacity:300t/h-900t/h
Technical Advantages
Solar First Group provide professional services to different customer groups.
For our clients, we not only provide design of the steel structure for integrated building, but also support you a to control the project budget and progress.
We can assist you to do analysis and design of various steel structure systems, create construction drawings, and also help you complete the complex structure modeling, analyzing or some special problems.
For construction organization, we are a long-term reliable technical cooperation partner of yours, depending on the honest and trustworthy brief and strong technical strength, Solar First Group has met various technical requirements of different construction enterprises, solved their problems of processing, construction, by optimizing the structure design and construction schemes to maximize project profits for them.
Product specifications
| Structure Type | Light Steel Space Frame |
| Application | Space Frame Coal storage |
| Design Standard | GB |
| Span | 88m |
| Height | 32.57m |
| Designed Capacity | 50000T |
| Wind Zone | 200kph |
| Seismic Zone | 4(Z=0.4) |
| Certificates | ISO, CE, SGS |
| Steel Material | Q355B |
| Surface Treatment | Hot dip galvanizing and paint. |
| Roof | color steel sheet(SMP finish ) |
| Natural lighting roof | FRP sheet |
| Installation | Supply supervision |
| Shipping | 45 days against receipt of down payment |
| Packaging Details | Special export packing for BJMB materials |
| Design life | 50 years |